Green roof, Doha office complex

Intensive green roof drainage across 9,000 m² under a tight dead-load budget.

Green roof, Doha office complex
The existing structure had only 180 kg/m² of spare capacity; a gravel drainage course would have exceeded it once saturated.

A 100 mm layer of 8–16 mm expanded clay brought the saturated weight of the drainage course to about 65 kg/m², freeing load budget for a deeper growing medium.

Scope of supply

  • Supply of 3,200 m³ in 1 m³ big bags
  • CIF sea freight to Hamad Port

Related projects

View all

2025 Qom, Iran

Hydroponic greenhouse, Qom

Hydroponic growing medium for six hectares of tomato and cucumber glasshouse.

Volume supplied 1,400

28-storey residential tower, Vanak

2024 Tehran, Iran

28-storey residential tower, Vanak

Structural lightweight concrete throughout the floor slabs, cutting seismic demand and foundation size.

Volume supplied 18,500