On soft ground, adding embankment means adding settlement. At a fifth of the weight of soil, expanded clay builds the same height for a fifth of the load.

Behind a retaining wall it does two things at once: less lateral pressure because it weighs less, and no pore water pressure because it drains freely. Both feed straight back into wall thickness and reinforcement.

Recommended grades

View all

Geotechnical & infrastructure

Leca Infra 10–30

Lightweight embankment fill at a fifth of the weight of soil.

Grain size
10–30 mm
Loose bulk density
250–300 kg/m³

Reference projects

View all

Completed projects

Lightweight embankment, Bandar Abbas port yard

Conventional fill replaced with expanded clay over soft marine clay, designing out long-term settlement.

Client
Ports & Maritime Organization
Location
Hormozgan, Iran
Year
2023
Volume supplied
42,000 m³

The yard sits on more than 12 m of soft marine clay. Calculations put consolidation settlement under a conventional embankment at over 400 mm across ten years.

Substituting the fill cut the load on the subgrade by about 75% and brought calculated settlement below 50 mm — with no preloading period and no delay to the construction programme.

Scope of supply

  • Supply of 42,000 m³ geotechnical aggregate
  • Bulk delivery scheduled to the placement programme

Get a quotation for your project

Send us the specification, the volume you need and the delivery point. Our technical sales desk replies within one working day.

Support and sales

Answered during working hours. Quickest route for a technical question.

Request a quotation